Day 6: (Thu Jan 30, Week 3) Armatures and Articulation¶
Notes for 2025-01-30.
New Assignments¶
New pair assignment, due Tuesday: Exercise: Location Study. Please submit your documentation to the Exercise 4 Shared Folder.
Administrative¶
IDeATe is organizing a fire extinguisher training session at 1PM today in Hunt A4 Near. This is the room adjacent to the sewing lab.
Please follow through on laser cutter qualification (IDeATe Laser Cutters).
Agenda¶
Show a few more exercise results
Introduction to new assignment
Pair formation for the exercise, based on preferred location. Some locations to consider:
benches
shrubbery
staircases
sidewalks
crosswalks
trees
windows
railings
lamp poles
playground swings
CFA lawn
Purnell passageway
The Randy Pausch Bridge
The Fence
Slideshow and discussion of armatures and articulation
Show and tell of past samples
Experimentation with stiffening
Meeting and discussion with partner