7.16. Day 16: (Aug 1) Full Production

Notes for Aug 1, 2017. See also the Calendar.

7.16.1. Notes from Day 15

  1. So, what happened over the weekend?
  2. Do we have a full-scale prototype?
  3. Is the music done?
  4. How did the flipper linkage go?

7.16.2. Agenda

  1. Administrative
    1. Orders have been placed.
  2. In-class
    1. Re-merge all software. Desk check logic.
    2. Assemble and revise full-scale prototype.
    3. Finalize portal tube design.
    4. Finish and test draft of affordance design.