7.16. Day 16: (Aug 1) Full Production¶
Notes for Aug 1, 2017. See also the Calendar.
7.16.1. Notes from Day 15¶
- So, what happened over the weekend?
- Do we have a full-scale prototype?
- Is the music done?
- How did the flipper linkage go?
7.16.2. Agenda¶
- Administrative
- Orders have been placed.
- In-class
- Re-merge all software. Desk check logic.
- Assemble and revise full-scale prototype.
- Finalize portal tube design.
- Finish and test draft of affordance design.