8.10. Day 10: (Jul 25) Development Phase 2

Notes for Jul 25, 2018. See also the Calendar.

8.10.1. Notes from Day 9

  1. Version control and file management. On a group project it is essential to agree on a discipline for passing data back and forth without lossage.
  2. Integration. I’ve combined all the CAD models into a unified design, with some updates.

8.10.2. Agenda

  1. Administrative
    1. ReplayFX, Thu July 26 to Sun July 19.
  2. Project Review
    • Crucial priorities
      1. Finalizing ramp, magnet, multi-ball, and spinner designs so that the playfield lanes can be finalized and fabricated.
      2. Testing the new electromagnet, designing magnet support structure.
      3. Testing actuation circuits for the multi-ball and magnet.
      4. Designing a wiring plan.
      5. Starting the software implementation.
      6. Determining any additional purchasing needs.
    • Secondary priorities
      1. Placing additional passive bumpers and lanes.
      2. Designing backboard assembly.
      3. Testing a sensing circuit for the pop bumpers.
      4. Testing and revising the the plunger assembly.
      5. Testing techniques for graphics (decals, paint).
      6. Designing new music and animation.