Project: Critical Path Components¶
The critical path in a project is the longest chain of dependent tasks. Due to the exploratory nature of our process, we do not usually try to write detailed project plans. But the rate-limiting bottlenecks in our developments tend to be either difficult design problems or components which need to be purchased.
At this point, you should be able to identify the chief risks to progress and show some substantive work toward solving them.
Deliverables¶
A brief report (one per group) posted to the shared drive including:
a short text statement identifying the most problematic area of your design process
photos of your current prototype parts
drawings or CAD renderings of any pending parts
list of parts still needed