2. Fall 2017 CalendarΒΆ
Our TA schedule will appear on the official reservations calendar for Hunt A10 at IDeATe PhysComp Lab Calendar. Please note that the Hunt library building does not begin 24 hour operation until as indicated on the Hunt Library Hours calendar.
The following course calendar is tentative and subject to change. For a description of the specific deliverables, please see the assignments page. For the day by day agendas, please see the Log Book or the numbered links in the ‘Class’ column below.
Date | Day | Class | Deliverables Due | In-Class Activity |
---|---|---|---|---|
8/28
|
Mon
|
|||
8/30
|
Wed
|
Co-interviews.
Basic circuit theory.
Electrical measurement.
Introduce Background Research assignment.
|
||
9/4
|
Mon
|
Co-Interview blog writeup.
|
Labor Day - no classes
|
|
9/6
|
Wed
|
Child Clearances session in Hunt cluster.
Resistive components.
Voltage divider circuits.
Introduce Electrical theory practice problems.
|
||
9/11
|
Mon
|
Analog and digital transduction.
Introduce Tech Demo 1: Single-Input Single-Output assignment.
(Registrar add deadline.)
|
||
9/13
|
Wed
|
Drivers and actuators.
Fire safety training.
|
||
9/18
|
Mon
|
Technical demo 1 (due Sunday at midnight).
|
||
9/20
|
Wed
|
Event loop programming.
State machines.
|
||
9/25
|
Mon
|
Technical demo 2 (due Sunday at midnight).
|
||
9/27
|
Wed
|
Basic mechanical components.
Flat pack mechanical design.
|
||
10/02
|
Mon
|
Technical demo 3 progress report.
|
postponed: SolidWorks 3D CAD: parts
|
|
10/04
|
Wed
|
postponed: SolidWorks 3D CAD: assemblies
Course project introduction.
|
||
10/07 | Sat | Field trip to Pittsburgh Children’s Museum. | ||
10/09
|
Mon
|
Technical demo 3 (due Sunday at midnight).
|
Skills practicum examination.
|
|
10/11
|
Wed
|
In-class field trip to Children’s School.
|
||
10/16
|
Mon
|
Practicum review.
Ideation review and discussion.
Project group formation.
|
||
10/18
|
Wed
|
Project group and title.
|
||
10/23
|
Mon
|
SolidWorks overview
(Mid-semester grades due.)
|
||
10/25
|
Wed
|
Revised proposals
|
||
10/30
|
Mon
|
Project proof-of-concept.
Purchase orders.
|
||
11/01
|
Wed
|
Full prototype design for review.
|
||
11/06
|
Mon
|
Rough draft of a full prototype.
|
(Registrar drop deadline.)
|
|
11/08 | Wed | 21 | ||
11/11 | Sat | Project phase 1 prototype. | Phase 1 tests and documentation at Children’s Museum. | |
11/13 | Mon | 22 | Progress report with revision plan. | In-class project debrief. |
11/15 | Wed | 23 | Progress report with revision plan. | |
11/20 | Mon | 24 | Revised prototype. | |
11/22 | Wed | Thankgiving - no classes | ||
11/27 | Mon | 25 | Final preparations for museum site tests. | |
11/29 | Wed | 26 | Working phase 2 prototype. | Final preparations for museum site tests. |
12/02 | Sat | Project phase 2 prototype. | Tentative: final tests and documentation at Children’s Museum. | |
12/04
|
Mon
|
Preliminary documentation.
|
In-class final project critique
Evening project open house.
|
|
12/06
|
Wed
|
Final project documentation.
|
Project disassembly.
Lab cleanup.
|